TONG MYUNG
PHOTO
SERVICE
REPORT
Company Reg No : 198602637N
Page
ISO 9001:2008 accredited
VESSEL:
PORT: SG
JOBNO :20131027
EQUIPMENT: STEERING GEAR PUMP
DATE:16/1/2014

MAKE: TONG MYUNG

MODEL: LV 260
DEFECTS/REASON FOR CALL: STEER GEAR PUMP OVERHAUL
ITEM
DESCRIPTION
REMARKS
JOB REQUEST
Discussed with C/E and yard F/M,
Requested to overhaul # 2and #3 steering
gear pump.
PUMP DISMANTLE FROM
SYSTEM
Isolated the hydraulic lines for steering
gear pump, removed piping’s and
foundation bolt then the pump
dismantled from the steering gear
system. After dismantled the pump
from system all the piping’s were
protected and covered properly.
Authorised HANLA IMS and since 1981 and over 8000 Track Recordsfor Deck Machinery, Steering
Gears, Valve Remote Controls.
SERVO CONTROLLER
PHOTO
SERVICE
raycOntrol pte ltd
REPORT
7 TOH GUAN ROAD EAST #05-07 SINGAPORE
608599Tel:65630544 Fax:65600941
Company Reg No : 198602637N
Page
sales@raycontrol.com
ISO 9001:2008 accredited
SERVO CONTROLLER:
Removed servo controllers and
actuactors from system, store and
protected safely.
LIFTING and TRANSPORTATION
Pump lifted via skylight and transported
safely to our workshop for overhauling
COMPLETE DISMANTLE
AND CLEANED:
Both pumps dismantle and cleaned for
vessel engineer inspection.
Authorised HANLA IMS and since 1981 and over 8000 Track Recordsfor Deck Machinery, Steering
Gears, Valve Remote Controls.
Dismantle, Inspection and Parts renewed
PHOTO
SERVICE
raycOntrol pte ltd
REPORT
7 TOH GUAN ROAD EAST #05-07 SINGAPORE
608599Tel:65630544 Fax:65600941
Company Reg No : 198602637N
Page
sales@raycontrol.com
ISO 9001:2008 accredited
PARTS RENEWED:
Renewed all bearings
And seals from ship supply.
FINAL TEST:
Reassemble both pumps and shop tested
satisfactory.
Authorised HANLA IMS and since 1981 and over 8000 Track Recordsfor Deck Machinery, Steering
Gears, Valve Remote Controls.
REINSTALL ONBOARD and full FUNCTION TEST
PHOTO
SERVICE
raycOntrol pte ltd
REPORT
7 TOH GUAN ROAD EAST #05-07 SINGAPORE
608599Tel:65630544 Fax:65600941
Company Reg No : 198602637N
Page
sales@raycontrol.com
ISO 9001:2008 accredited
REINSTALL ONBOARD:
Reinstall both pumps to its original
position.
Renewed seals in servo block and
controller and reinstalled to its position.
Carry out adjustments of Zero and Span
for pump stroke.
FULL FUNCTION TEST :
Commission and carried out full
function test satisfactory to vessel C/E
and Superintendent.
REPORTED BY
ARUN KUMAR
Authorised HANLA IMS and since 1981 and over 8000 Track Recordsfor Deck Machinery, Steering
Gears, Valve Remote Controls.